No | Nama Peserta | K | SK | A | T | ST | P | PT | HN | H | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | CV. SEGITIGA EMAS KONSULTAN - 02.689.100.2-101.000 | 74,3 | 77,3 | Rp. 217.550.000,00 |
Rp. 217.550.000,00 |
||||||||
2 | CV. AXIAL HIGHWAY ENGINEERING CONSULTANT - 02.971.067.0-101.000 | 71,9 | Tidak memasukkan dokumen penawaran administrasi teknis | ||||||||||
3 | CV. GANESSA CONSULTANT GROUP - 02.029.870.9-101.000 | 64,0 | Tidak mencukupi nilai passing grade | ||||||||||
4 | PT. DUA MITRA KOALISI - 93.189.816.7-101.000 | 60,0 | Tidak mencukupi nilai passing grade | ||||||||||
5 | CV. INFRA MADYA KONSULINDO - 02.102.011.0-101.000 | 62,9 | Tidak mencukupi nilai passing grade | ||||||||||
6 | CV. TARGET CONSULTANT - 02.650.677.4-101.000 | 29,5 | Tidak mencukupi nilai passing grade | ||||||||||
7 | CV. BATOR ACEH CONSULTANT - 72.356.091.8-101.000 | 69,6 | Tidak mencukupi nilai passing grade | ||||||||||
8 | CV. KERN DESIGN STUDIO - 02.027.469.2-101.000 | 71,4 | Tidak memasukkan dokumen penawaran administrasi teknis | ||||||||||
9 | CV. PUALAM KEMBAR - 01.452.682.6-101.000 | 45,6 | Tidak mencukupi nilai passing grade | ||||||||||
10 | CV. SKETSA DESAIN - 03.128.371.6-101.000 | ||||||||||||
11 | CV. DIAMETER DESIGN CONSULTANT - 03.003.911.9-101.000 | ||||||||||||
12 | CV. POWERPLAN - 82.873.961.5-104.000 | ||||||||||||
13 | cv.blang raya desain - 75.293.809.2-101.000 | ||||||||||||
14 | PT REKADAYA ELEKTRIKA CONSULT - 02.900.132.8-072.000 | ||||||||||||
15 | CV. WAHANA UTAMA CONSULTANT - 72.079.340.5-102.000 | ||||||||||||
16 | PT. TRAYA MADANI KONSULTAN - 83.842.717.7-101.000 |
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak