No | Nama Peserta | K | SK | A | T | ST | P | PT | HN | H | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | CV. KERN DESIGN STUDIO - 02.027.469.2-101.000 | 77,0 | 76,0 | Rp. 340.900.000,00 |
Rp. 340.900.000,00 |
||||||||
2 | CV.Multi Prasarana Design - 02.123.237.6-102.000 | 70,8 | 70,5 | Rp. 345.180.000,00 |
Rp. 313.800.000,00 |
||||||||
3 | ZARINDO STRUCTURE - 02.688.853.7-101.000 | 71,0 | 72,2 | Rp. 346.400.000,00 |
Rp. 346.400.000,00 |
||||||||
4 | PT. PUTRA ANDESPAL PERKASA - 03.286.577.6-101.000 | 33,5 | Tidak mencukupi nilai passing grade | ||||||||||
5 | CV. NABILINDO MANDIRI CONSULTANT - 03.273.458.4-101.000 | 14,4 | Tidak mencukupi nilai passing grade | ||||||||||
6 | BEUNA ENGINEERING KONSULTAN - 02.689.419.6-101.000 | 46,4 | Tidak mencukupi nilai passing grade | ||||||||||
7 | CV. Mitra Konsorsium - 80.291.428.3-105.000 | 67,0 | Tidak mencukupi nilai passing grade | ||||||||||
8 | CV.CICUBA CONSULTANT - 02.020.777.5-103.000 | 69,0 | Tidak mencukupi nilai passing grade | ||||||||||
9 | CV. AISAR DESINDO CONSULTANT - 02.954.198.4-104.000 | 69,0 | Tidak mencukupi nilai passing grade | ||||||||||
10 | CV.ZINCO - 71.875.626.5-105.000 | 65,0 | Tidak mencukupi nilai passing grade | ||||||||||
11 | CV. BATOR ACEH CONSULTANT - 72.356.091.8-101.000 | ||||||||||||
12 | CV. KARYA PUGA - 01.222.662.7-101.000 | ||||||||||||
13 | CV. Multi Cipta Consultant - 01.219.385.0-101.000 | ||||||||||||
14 | CV DYORBIT - 02.561.965.1-101.000 | ||||||||||||
15 | CV. TESSA ENGINEERING CONSULTANT - 01.763.894.1-101.000 |
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak